Project management BPO is the transfer of planning, supervision and milestone control for a defined project to an external provider under a written contract. PayrollBD runs that project office for offshore and onshore ventures in Bangladesh. We keep the safety and contractor records the Bangladesh Labour Act, 2006 requires, and hand the full record set back at project close.

In short: project management BPO moves planning, milestone control and record keeping to an external provider. Under the Bangladesh Labour Act, 2006 the venture owner remains the employer and carries the statutory duty. Five record sets are handed back at contract close.

Feasibility audit and milestone planning stage of an offshore project in Bangladesh

Why Use a Project Provider?

A venture moves its project office to a provider when the work is rule-bound, repeats at every milestone, and leaves a record that has to survive an inspection. Feasibility audits, subcontractor checks and safety records all fit that description, because the format of each record is set by statute and not by preference.

Kept in house, the same project office needs a team sized for the heaviest milestone and idle between them. Moved across, it is paid for by the milestone actually delivered, and the statutory duty stays exactly where the law puts it. For the workforce side of a venture we work with our staff recruitment and selection team.

Why do foreign companies trust PayrollBD?

2007Running payroll in Bangladesh since
57+Client companies
867+Employees paid each month

PayrollBD has run payroll in Bangladesh since 2007. PayrollBD serves 57+ client companies. PayrollBD’s payroll pays 867+ employees each month. These figures come from PayrollBD’s own payroll and client records. One of those clients is a company headquartered in Japan. PayrollBD runs its onboarding and transition, its monthly payroll and its day-to-day employee support for 48+ employees in Bangladesh. The full case is on the managed payroll services page. Another client, an apparel manufacturer headquartered in Vietnam, hired a 35-person team in Bangladesh in 21 days through PayrollBD; that case is on the PEO services page.

What Does a Project Management BPO Contract Cover?

The engagement covers the cycle work a project office must finish on a fixed calendar. That means feasibility and design audits, project-specific engineering, milestone tracking, subcontractor facility audits, safety records and the final documentation set. Every engagement schedule writes the boundary between provider and venture owner into the contract.

Project management BPO: work performed by PayrollBD and duties retained by the venture owner
FunctionPerformed by PayrollBDRetained by the venture owner
FeasibilityRun the plan and design auditApprove the scope and fund it
EngineeringDeploy hardware and technical resourceOwn the asset and the design intent
Site safetyKeep the safety record book currentRemain the employer under the Bangladesh Labour Act 2006
SubcontractorsAudit facilities and report findingsAward and terminate each contract

Where a line is not written into the table, it stays with the venture owner by default. Site logistics are coordinated with our facility management team.

Who Carries the Statutory Duty in Bangladesh?

The venture owner carries the statutory duty in every case, because outsourcing moves the work and not the obligation. Sections 5 and 9 of the Bangladesh Labour Act 2006 require the employer to issue appointment letters and keep the register of workers. Where more than twenty-five workers are employed, section 90 also requires a safety record book, and section 325 requires notice to the Chief Inspector at least fifteen days before work begins. Section 3A of the same Act sits apart from those duties: it requires a contracting agency that supplies workers on contract to be registered by the Government in its own right. PayrollBD does the employer-side tasks and keeps the proof.

Duties under the Bangladesh Labour Act, 2006 — who carries each, the record it leaves and its deadline
ObligationRecord it leavesSource in the ActDeadline in the Act
Issue an appointment letter and identity cardSigned letter with photo identity cardSection 5Before the worker is employed
Maintain a register of workersRegister open to the Labour Inspector in working hoursSection 9At all times during working hours
Maintain a safety record bookDated safety record book and the safety information boardSection 90Where more than 25 workers are employed
Give notice before work beginsNotice sent to the Chief InspectorSection 325At least 15 days before starting work
Report an accident causing death or injuryWritten or digital notice to the Inspector of the Department of Inspection for Factories and Establishments and to the regional or divisional labour officeSection 80(1)Within 2 working days of learning of it
Report a prescribed dangerous occurrence, with or without injuryNotice to the Inspector General and the local Inspector of the Department of Inspection for Factories and Establishments, and to the regional or divisional labour officeSection 81Within 3 days
Enter an injury that keeps a worker off workEntry in the register prescribed by the rulesSection 80(2)Where absence exceeds 48 hours
Return the register entries half-yearlyCopy of the register entries sent to the Chief InspectorSection 80(3)Within 15 days after 30 June and 31 December
Provider side — register the contracting agencyGovernment registration held by the agency that supplies workers, not by the venture ownerSection 3AHeld before workers are supplied

 

The wording of each section is published by the Ministry of Law in the authentic text of the Bangladesh Labour Act, 2006. Workplace compliance is administered by the Department of Inspection for Factories and Establishments. These duties sit under employment law only. Registration with the Invest Bangladesh Authority (formerly the Bangladesh Investment Development Authority, BIDA), environmental clearance from the Department of Environment and any sector licence a project needs are separate approvals. They stay with the venture owner, and PayrollBD does not file them. The table follows the current text of each section, including the changes the Bangladesh Labour (Amendment) Act 2026 made to sections 80 and 81.

How Does the Project Office Handover Run?

Handover runs in five stages, and each one closes with a document the venture owner can point to. Nothing moves to the next stage until the record from the last one exists. A gap is therefore visible on the day it happens, not at the end of a quarter.

  1. 1Scope and boundary. The activities moving across are listed in a schedule, with the duties the venture owner retains named beside them.
  2. 2Record intake. Feasibility reports, design drawings and the existing safety record book are collected and checked against the current site headcount.
  3. 3Calendar build. Each milestone, inspection and review date is fixed against the deadlines in the Bangladesh Labour Act 2006, then agreed in writing by both parties.
  4. 4Parallel milestone. One full milestone cycle is processed beside the existing method, and the two outputs are compared line by line before switching.
  5. 5Live run and review. The provider runs the cycle, and a booked review checks the risk register, the safety record book and the filing proof.

 

The same five stages apply where the scope is a single installation rather than a full project office, and pre-award checks are run with our due diligence specialists.

What Are the Key Project Activities?

PayrollBD runs twelve activities for your project, from setup and execution monitoring to subcontractor audits and client communication. PayrollBD structures each activity as a discrete task with its own owner and its own record, rather than leaving delivery to a verbal instruction.

Initial Setup & Development
  1. 1Plan & design audit — feasibility assessment closed out before any equipment is committed.
  2. 2Execution of project ideas — tasks sequenced against the venture plan.
  3. 3Observation of work progress — real-time tracking with multi-point inspections.
  4. 4Value control & development — continuous scope and budget alignment.
  5. 5Employee participation at gatherings — open correspondence with all partners.
  6. 6Factory acceptance testing — software and hardware verified before handover.
Auditing, Communication & Finalisation
  1. 7Audits of subcontractor facilities — site investigation logged against each contractor organisation.
  2. 8Pre-construction meetings — attendance at the preliminaries where the environmental and social studies a site needs are identified.
  3. 9Regular communication with clients — asynchronous protocols across time zones.
  4. 10Off-site queries answered — every question raised away from the site logged, answered and closed in writing.
  5. 11Utility metering on site — electrical and mechanical consumption read per stage and billed against the milestone that used it.
  6. 12Additional items & credits — variance logged against the milestone that caused it.

Which Methodologies Guide Project Delivery?

Six control methods keep your project on plan. The first three are task management with a named approver, feasibility appraisal feeding a risk register, and on-site examination against a written HSEQ checklist. The other three are design administration with revision control, Gantt-mapped scheduling with factory acceptance testing, and construction control under the safety provisions of the Bangladesh Labour Act, 2006. Each method is defined by the record it produces rather than by the tool it uses. Sprint-level execution of these methods on ICT and engineering builds is set out separately under offshore project management.

1. Task Management

Experienced project directors and cross-functional teams hold the timeline, the change log and the non-disclosure terms for each venture. One named director signs every milestone review, so a question about who approved a change has an answer in the file rather than in a recollection.

2. Feasibility Appraisal

Feasibility appraisal is completed in the opening phase, before any equipment is committed. The appraisal names the technical, environmental and contractual risks it found. Each one is carried into the risk register with an owner and a review date attached to it.

3. On-Site Examinations

On-site examinations run against a written HSEQ checklist rather than a walk-through impression. Findings are dated, photographed and then closed out in the safety record book. Section 90 of the Bangladesh Labour Act 2006 requires that book at every establishment with more than twenty-five workers.

4. Design Administration

Design administration covers blueprinting, structural overviews and the deployment of technical hardware to the site. Each drawing revision is logged against the milestone it belongs to, so the version built on site is always the version the venture owner approved in writing.

5. Advanced Technology

Enterprise forecasting tools and Gantt mapping hold the schedule, and factory acceptance testing runs before any software or hardware handover. Test results are recorded per component, so an unresolved defect blocks the handover instead of travelling to the live environment.

6. Construction Control

Construction management executes the venture plan against international HSEQ standards on every structural arrangement. Personal protective equipment is mandatory under section 78A of the Bangladesh Labour Act 2006, which also requires a record book of the equipment issued. An accident on site triggers the notice that section 80(1) requires within two working days, to the Inspector of the Department of Inspection for Factories and Establishments and to the regional or divisional labour office. A prescribed dangerous occurrence, with or without injury, runs a notice of its own, which section 81 sets at three days.

What Do the Terms on This Page Mean?

Seven plain definitions explain the terms you will meet in a project management contract in Bangladesh. Each is defined once here so the rest of the page can use it without a gloss.

  • BPOBusiness process outsourcing: the transfer of a defined, repeating business function to an external provider under a written contract.
  • PMOProject management office: the standing function that plans, tracks and documents projects, as distinct from delivering any single one.
  • HSEQHealth, safety, environment and quality: the combined checklist an on-site examination runs against, so one visit closes all four headings.
  • PPEPersonal protective equipment: the safety equipment section 78A of the Bangladesh Labour Act, 2006 requires an employer to supply and to record in a book.
  • SMART objectiveA milestone target that is specific, measurable, attainable, relevant and time-bound, so completion is checkable rather than arguable.
  • Gantt chartA schedule drawn as bars on a calendar, showing which tasks overlap and which cannot start until an earlier one finishes.
  • Factory acceptance testingTesting equipment or software against its specification before handover, so an unresolved defect blocks the handover instead of reaching the live site.

How Is a Project Engagement Priced?

AnswerProject management engagements are priced by structure, not by headcount alone. The written quotation states the scope, the milestone set, the reporting cycle and the records to be produced. Scope changes are quoted separately and in writing before the work starts. The figure approved at signature is therefore the figure billed against.

Three structures are in normal use. The first is a fee per milestone delivered. The second is a fixed monthly fee for a standing project office. The third covers a single defined scope, such as one feasibility audit. The engagement schedule names which structure applies before work starts.

Which structure fits depends on whether the work repeats. A project office running continuously, with milestone tracking, subcontractor audits and safety record keeping every month, sits naturally on a standing monthly fee. A one-off installation or a single design audit sits on a defined-scope fee, because there is no recurring cycle to carry.

Variance is handled separately from the fee. Cost-control documentation sits behind each variance and is traced to the milestone that caused it. A change in scope therefore appears as its own line rather than disappearing into the next invoice. A written quotation follows the scope assessment, and final billing statements are handed over with the rest of the record set when the contract ends.

What Is the Minimum Engagement Term?

AnswerThere is no fixed minimum term. An engagement runs to the milestone set written into the contract. A short feasibility appraisal and a multi-year construction programme sit under the same agreement type. Notice periods for ending the engagement early are stated in the contract at signature, and the record set is handed back whenever the engagement closes.

The term is set in the engagement schedule and is normally tied to a delivery boundary rather than a calendar period, because the statutory records have to close cleanly. The shortest sensible engagement is one complete milestone cycle, since the parallel-run stage compares a full cycle before the switch.

The reason is the handover sequence rather than a commercial preference. Stage four processes one full milestone cycle beside the existing method and compares the two outputs line by line. An engagement that ends before that comparison closes leaves the venture owner with a half-built record set, and nothing to check it against.

Who Owns the Project Documents and Designs?

AnswerThe venture owner owns the project documents and designs. Intellectual property, drawings, repositories and structural overviews stay with the owner during the engagement and after it ends. PayrollBD holds them only to do the work. Everything produced during the engagement belongs to the owner as it is created, so the full set transfers back at contract close without a separate assignment step. The engagement table on this page draws the same line for engineering.

The boundary covers work produced during the engagement, not only material handed in at the start. Feasibility reports, blueprints, risk registers and audit findings are the owner’s property as they are created. The same position applies on our offshore project management engagements.

Which Hours Does the Project Office Cover?

AnswerCoverage is set in the engagement schedule, not assumed. The schedule names the working days, the site hours and the escalation route outside them. A venture in another time zone therefore knows when a decision will be answered. Where site work runs beyond ordinary hours, those hours are recorded against the worker in the register the Bangladesh Labour Act 2006 requires.

The project office works to Bangladesh Standard Time, UTC+6, which gives a working-day overlap with Europe in the Bangladeshi afternoon and a morning handover into North America. Site attendance follows the site calendar, and correspondence runs on written protocols.

Asynchronous protocols across time zones are already one of the twelve project activities. In practice a decision needed from the venture owner is raised in writing. The milestone it blocks is named beside it, so the owner answers once rather than joining a call to discover what is being asked. Several notice periods in the Bangladesh Labour Act 2006 are counted in working days rather than calendar days, such as the two working days section 80(1) allows to report an accident. The milestone calendar is therefore built against working days, and public holidays are factored in.

In-House, Outsourced or EOR-Based?

A project office in Bangladesh can be staffed three ways: in house, outsourced to a provider, or through an employer of record. The three differ less in what gets done than in who answers for it and where the paperwork lives. The five questions in this table decide the choice.

In-house, outsourced and EOR-based project offices compared on liability, cover, custody, ramp and escalation
QuestionIn-house project officeOutsourced project officeEOR-based team
Statutory liabilityVenture owner, as the employer under the Bangladesh Labour Act 2006Venture owner, as the employer; outsourcing moves the work, not the obligationThe employer of record, which is the legal employer of the workers it engages
Cover between milestonesTeam sized for the heaviest milestone and idle between themContinuous, because record keeping and audits run on the calendar, not the milestoneContinuous for the seats engaged, scoped to people rather than to the project cycle
Record custodyHeld by the venture owner throughoutHeld by the provider during the engagement, handed back as five record sets at closeEmployment records with the employer of record; project records with the venture owner
Ramp timeRuns from recruitment, so it tracks the hiring cycleRuns through five handover stages, ending with one milestone cycle processed in parallelRuns from the point the employer of record can lawfully engage each worker
Escalation routeInternal line managementNamed director signs each milestone review; slippage escalated the day it is recordedSplit: delivery to the venture owner, employment to the employer of record

One deadline is the same in all three columns. Where an accident causes loss of life or bodily injury, section 80(1) of the Bangladesh Labour Act 2006 gives the employer two working days from learning of it to notify the Inspector of the Department of Inspection for Factories and Establishments and the regional or divisional labour office. The model chosen decides who that employer is, not whether the clock runs.

What Records Does a Project Engagement Produce?

A PayrollBD project engagement in Bangladesh produces five record sets. The first three are feasibility and design records, milestone and progress logs, and the safety record book. The last two are the subcontractor audit file, and final billing and cost records. Each stage leaves its document behind, and the full set is handed back to the venture owner when the contract ends.

  • Feasibility & design recordsPlan and design audit report, blueprints and the structural overviews the venture was approved against.
  • Milestone & progress logsGantt-mapped schedules with multi-point inspection notes recorded against each execution stage.
  • Safety record bookMaintained at the establishment as section 90 of the Bangladesh Labour Act 2006 directs wherever more than twenty-five workers are employed, open to the Inspector.
  • Subcontractor audit fileFacility audit findings held against each contractor organisation. An agency that supplies workers must also hold the Government registration that section 3A of the Bangladesh Labour Act 2006 requires.
  • Final billing & cost recordsTransparent final billing statements with the cost-control documentation behind each variance.

Sourcing decisions inside a live project follow the same record discipline as our sourcing and procurement BPO team.

Why Outsource Project Management?

Outsourcing project management to Bangladesh delivers six operating advantages. They run from deadline reliability and specialist access to compliance efficiency, risk mitigation, audit readiness and cost control. Each advantage is grounded in a documented process step rather than a promotional claim. The six below each say how the advantage is delivered, so the claim can be checked against the work rather than taken on trust.

  1. 1Deadline reliability — milestones delivered against SMART objectives fixed per stage.
  2. 2Specialist access — directors, engineers and analysts assigned by discipline.
  3. 3Compliance sequencing — the licence and permit calendar tracked stage by stage, with each filing the venture owner makes logged against the milestone it gates.
  1. 4Risk mitigation — insurance obligations handled, and the PPE duty under section 78A of the Bangladesh Labour Act 2006 tracked.
  2. 5Audit readiness — service books, registers and the safety record book kept current.
  3. 6Cost control — transparent final billing with variance traced to its milestone.

What Do Venture Owners Ask?

PayrollBD sets the fee by structure, not by headcount alone: a fee per milestone delivered, a fixed monthly fee for a standing project office, or one fee for a single defined scope. Four questions come up in almost every first conversation about moving a project office to a provider in Bangladesh. Each answer states the position first and the reason second, including the one limit a venture owner should know before signing.

Questions asked before the contract is signed

The four answers below cover accountability, the scope boundary, schedule control across time zones and how project risk is handled. Where one applies, each answer names the record or the contract clause it rests on. Where a duty stays with the venture owner rather than moving to PayrollBD, the answer says so instead of leaving it implied.

How is PayrollBD accountable on a project?

Accountability runs through the contract and the record set, not through a claim. The engagement schedule names each activity the provider performs, the record it leaves and its due date. The statutory duty stays with the employer under the Bangladesh Labour Act, 2006, so the provider answers for the work while the owner faces the Inspector.

What does the project management scope cover?

The scope covers the cycle work a project office must finish on a fixed calendar. That means feasibility and design audits, project-specific engineering, milestone and progress tracking, subcontractor facility audits, safety record keeping and the final documentation set. Factory acceptance testing and cost variance reporting run under the same contract. Anything needing a decision on scope, budget or award of a contract stays with the venture owner.

How are offshore project schedules controlled?

Schedules are controlled with integrated resource planning, Gantt mapping and SMART objectives, meaning specific, measurable, attainable, relevant and time-bound targets fixed per milestone. Slippage at any single stage is escalated to the responsible director on the day it is recorded rather than absorbed into the next phase. Here is the honest limit: a delay caused by customs clearance or a regulator outside employment law sits with the owner.

How is risk mitigation handled on a project?

Risk mitigation runs on a written register rather than a judgement call. Each risk found at feasibility is logged with an owner and a review date. Subcontractor facilities are audited against the same HSEQ checklist applied to our own teams. Personal protective equipment is mandatory under section 78A of the Bangladesh Labour Act 2006, and an accident on site triggers the notice section 80 of the same Act requires.